Subaie, E.
Eid Subaie is a Plant Operation Engineer with Saudi Aramco at the company’s Eastern region terminal operations at the Ju’aymah Tank Farm. He has 16 yr of experience in industrial operating facilities, resolving operational upsets and plant problems.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Million Air and Avfuel bring SAF to Austin, Texas (U.S.) 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

