Rinawi, A.
Abdulkarim Rinawi is a piping and vibration specialist at Saudi Aramco. He has 28 yr of experience with piping, structural and rotating equipment vibration, pressure pulsation, pipe stress and flow analysis in refining, piping, pipelines, power generation and nuclear facilities. Dr. Rinawi has a PhD in structural engineering from the University of California at Berkeley.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TotalEnergies extends its fuel price cap policy in France until the end of April 4/7
- Navigating the montan wax challenge with renewable alternatives for polymers 4/7
- AFR selects Axens as technology provider for Texas (U.S.) refinery 4/7
- Iran has attacked Saudi Arabia's Jubail petrochemical complex, IRGC says 4/7
- Iran's Marvdasht Petrochemical complex attacked by US and Israel 4/7
- Fluor awarded engineering and design contract for America First Refining's refinery in South Texas 4/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

