Rinawi, A.
Abdulkarim Rinawi is a piping and vibration specialist at Saudi Aramco. He has 28 yr of experience with piping, structural and rotating equipment vibration, pressure pulsation, pipe stress and flow analysis in refining, piping, pipelines, power generation and nuclear facilities. Dr. Rinawi has a PhD in structural engineering from the University of California at Berkeley.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BPCL and National Sugar Institute collaborate to advance sweet sorghum as a sustainable biofuel source 2/21
- Resynergi secures $18 MM to accelerate plastic recycling innovation 2/21
- LiqTech receives supplier approval for water treatment system for WinGD dual-fuel engine 2/21
- Japan's Eneos shuts 141,000-bpd Sakai CDU after a fire 2/21
- Russia's idle oil refining capacity estimated 82% up in February 2/21
- U.S. refiners mull switch to alternative lighter crudes amid Trump tariff fears 2/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction