Nikul Jadav is a Consultant Piping Engineer for the Tanajib Gas Plant Projects, part of Saudi Aramco’s Marjan Development Program. He has worked over the last 20 yr across diverse projects and clients within the oil and gas sector, with a key focus on plant layout, piping design and engineering. Mr. Jadav holds an MS degree in project management from The University of Liverpool, U.K.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS receives €300-million grant to rejuvenate and decarbonize its Lavera plant 2/19
- AGC Vinythai commissions expanded chlor-alkali plant and e-BiTAC electrolyzers from thyssenkrupp nucera 2/19
- BASF launches AdBlue GE (green electricity) to decarbonize mobility value chain 2/19
- Carbon Neutral Fuels select Johnson Matthey, bp and Honeywell UOP technologies for UK SAF plant 2/19
- ExxonMobil starts operations on second carbon capture project in Louisiana (U.S.) 2/19
- Pall introduces two new technologies to reduce CAPEX and TCO in oil and gas processing 2/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction