Jadav, N.
Nikul Jadav is a Consultant Piping Engineer for the Tanajib Gas Plant Projects, part of Saudi Aramco’s Marjan Development Program. He has worked over the last 20 yr across diverse projects and clients within the oil and gas sector, with a key focus on plant layout, piping design and engineering. Mr. Jadav holds an MS degree in project management from The University of Liverpool, U.K.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium introduces world's first pharmaceutical bottle partially made with wood-based plastics 10/30
- Aramco, Petrovietnam sign Collaboration Framework Agreement for increased petrochemicals trade 10/30
- TotalEnergies studies Moroccan project to export green ammonia to Europe 10/30
- Changxing Island accelerates development of world-class green petrochemical industrial base 10/30
- U.S. gasoline stockpiles hit 2-yr low on stronger demand 10/30
- Dangote says refinery has 500 MM liters of petrol in storage, can meet Nigeria's demand 10/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction