Badughaish , M.
Mohammed Badughaish is a Mechanical Engineer with 12 yr of experience in rotating equipment within the oil and gas industry. His work experience has focused on hydraulic pumps, troubleshooting and maintenance. He works as a pump engineer in Saudi Aramco’s Consulting Services Department. He obtained his BS degree from King Fahd University of Petroleum and Minerals (KFUPM) and an MS degree in mechanical engineering from the University of Central Florida.
Case study: Reliability of low-flow, high-head pumps
Pumps are one of the key elements used in different industries, including oil and gas, petrochemicals and water treatment.
Causes of reduced or stopped flow in controlled-volume pumps
Controlled-volume (CV) pumps, also known as metering or dosing pumps, are designed to deliver a small quantity of fluid at a precise rate with relatively high pressure.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction