Fantolini, A. M.
is the LNG technology projects manager at Saipem Corporate. After graduating with a degree in chemical engineering, he gained 18 years of experience in the oil and gas industry, along with specific knowledge of LNG plant design.
Limit the rate of change of fuel gas properties with mixing drum
The fuel gas mixing drum is an integral part of many plants, especially LNG plants.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Técnicas Reunidas will carry out the engineering services to develop one of Europe’s largest green methanol plant 3/11
- ABB signs agreement with Dow as the automation partner to support Path2Zero ethylene complex in Canada 3/11
- HIF Global awarded first U.S. approval for e-Fuels design pathway 3/11
- Indonesia to build oil refineries with total capacity of 1 million bpd 3/11
- WasteFuel and ITC commence front-end engineering design on world-scale green methanol facility in Ankara, Turkey 3/11
- Crude shipments on Druzhba pipeline suspended after drone attack, Hungary says 3/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction