Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC deploys heavy-duty inspector robot for hazardous environments 5/21
- Indonesia to roll out ethanol-blended gasoline, B50 biodiesel from July 1 5/21
- Australia plans biofuel mandates to boost its energy security 5/21
- HyOrc commences fabrication for Porto waste-to-methanol plant and advances European project pipeline 5/21
- Chevron introduces next-gen Techron in U.S. Chevron and Texaco gasolines 5/21
- Kremlin sees no risk to fuel supply in Russia amid attacks on refineries 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

