Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- E-Fuel producer INERATEC receives €70-MM commitment from EIB and Breakthrough Energy Catalyst 1/31
- Avfuel powers SAF expansion with new U.S. supply points 1/31
- Russia's Lukoil eyes $2 B from Bulgaria refinery sale 1/31
- NEXTCHEM (MAIRE) awarded process design package to upgrade urea plant in China 1/31
- Lhyfe secures €11-MM grant for a second 10-MW production site in Sweden 1/31
- Syensqo and Ardent partner to accelerate point source carbon capture innovation 1/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction