Gala, P.
is a Senior Design Engineer at Reliance Industries Ltd. and is part of the project management team. She has worked on benzene recovery units, extract hydrotreater units, SCAN-Finer units, as well as pressure vessels, shell-and-tube heat exchangers and packaged items. Prior to Reliance Industries Ltd., she worked for Bechtel India and Larsen & Toubro Ltd. Ms. Gala graduated from L. D. College of Engineering, Ahmedabad, India, in mechanical engineering.
Uncommon lessons: Shell-and-tube heat exchangers—Part 2
Shell-and-tube heat exchangers (STHEs) are the most common heat transfer process equipment in all types of industrial plants.
Uncommon lessons: Shell-and-tube heat exchangers—Part 1
Shell-and-tube heat exchangers (STHEs) are the most common heat transfer process equipment in all types of industrial plants.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction