Moreno, C. G.
Carlos García Moreno is a Senior Consultant with more than 18 yr of experience in the oil and gas industry. He started his career as a Production Supervisor in an NGL fractionation plant with Pluspetrol Peru Co. Recently, he developed his career in marine terminals with Oiltanking Peru S.A. and Solgas S.A. He earned a BS degree in petrochemical engineering from the National University of Engineering (Peru), an MBA from Centrum Católica Business School and an MS degree in project management from ESAN Business School.
Alarm management: A pillar of process safety management
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Management
/ Safety
The following describes how an adequate implementation of alarm management is a fundamental part in process safety management (PSM).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

