Sharma, A.
is a Process Engineer at an ethylene plant, and has more than 4 yr of experience in the steam cracker unit. He completed his B.Tech degree in chemical engineering from the National Institute of Technology Raipur, India with honors and completed a process equipment design course from IIT Roorkee. He is an active professional member of the American Institute of Chemical Engineers and an associate member of IChemE. He has published three articles and is involved in the smooth operation and troubleshooting of the plant.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Southern Energy Renewables and Axens Sign MoU to advance SAF projects in Louisiana and beyond 4/8
- One of the largest heat pumps in the world has reached BASF's Ludwigshafen site 4/8
- LANXESS introduces surcharge for Lewatit ion exchange resins 4/8
- HyOrc secures industrial site and accelerated permitting path for Portugal green methanol project 4/8
- India raises HPCL Rajasthan Refinery project cost to $8.6 B 4/8
- Iranian Oil Refining Co. confirms attack on Lavan refinery 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

