Baybutt, P.
Paul Baybutt is the founder and CEO of Primatech Inc., a firm that specializes in process safety, security and risk analysis. He holds a PhD from the University of Manchester in England.
Process safety incidents involving simultaneous operations
Environment & Safety
/ Petrochemicals
/ Refining
/ Safety
/ Pumps
/ Reactors
/ Management
/ Loss Prevention
/ Heat Transfer
/ Equipment
/ Environment
/ Corrosion
/ Compressors
/ Acid Gas Removal
Some process safety incidents occur as the result of simultaneous or sequential occurrences of operations or activities that interfere or clash with each other.
Process safety incidents, cognitive biases and critical thinking
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Economics
/ Environment
/ Loss Prevention
/ Management
/ Safety
Process hazard analysis (PHA) is performed to identify possible hazard scenarios that may occur in a process.
Implement a competency management system for process safety
Managing the competency of company personnel is a critical aspect of process safety.
Cyber security: Are your computer control systems safe from attack?
Performing a CSVA identifies vulnerabilities and needed security measures
Human factors analysis for process safety
Apply LOPA-HF to a fired furnace
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction