Baybutt, P.
Paul Baybutt is the founder and CEO of Primatech Inc., a firm that specializes in process safety, security and risk analysis. He holds a PhD from the University of Manchester in England.
Process safety incidents involving simultaneous operations
Environment & Safety
/ Petrochemicals
/ Refining
/ Safety
/ Pumps
/ Reactors
/ Management
/ Loss Prevention
/ Heat Transfer
/ Equipment
/ Environment
/ Corrosion
/ Compressors
/ Acid Gas Removal
Some process safety incidents occur as the result of simultaneous or sequential occurrences of operations or activities that interfere or clash with each other.
Process safety incidents, cognitive biases and critical thinking
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Economics
/ Environment
/ Loss Prevention
/ Management
/ Safety
Process hazard analysis (PHA) is performed to identify possible hazard scenarios that may occur in a process.
Implement a competency management system for process safety
Managing the competency of company personnel is a critical aspect of process safety.
Cyber security: Are your computer control systems safe from attack?
Performing a CSVA identifies vulnerabilities and needed security measures
Human factors analysis for process safety
Apply LOPA-HF to a fired furnace
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction