Patel, S.
Typical fired heater problems and root causes
A quick look at symptoms can provide operational answers
Canadian oil sands: Opportunities, technologies and challenges
Energy resources found at the Arctic Circle have potential
Spot energy-savings opportunities in your plant
Choosing the appropriate equipment design and other system components can improve system reliability and save money
Understand the difference between solid and serrated fins
Here are the advantages and disadvantages of each type and how to calculate their surface areas and efficiencies
Optimizing O2 levels in fired heaters
Here's the procedure this plant used to reduce fuel consumption and emissions
Simplify your thermal efficiency calculation
Standard charts and a spreadsheet help
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Pakistan-China to sign MoU on oil-to-chemicals complex in June 5/17
- China biofuel makers bet on sustainable aviation fuel 5/17
- AMETEK Land provides thermal imagers to large ethylene producer 5/17
- China's refinery output falls for first time in 20 mos due to maintenance 5/17
- Dow, SCG Chemicals sign MoU to transform 200,000 tpy of plastic waste into circular products 5/17
- Ukraine long-range attacks continue to disrupt Russian refining, energy operations 5/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction