Bhatt, S.
Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

