Bhatt, S.
Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
- Day 2 of WGLC 2024 begins with Chevron speaker’s inspiring, relatable message 11/21
- MOL Group, KazMunayGas partner on exploring petrochemical production 11/21
- WGLC: Innovating AI adoption 11/21
- Solvay uses waste wood to power soda ash and bicarbonate plant in Germany 11/21
- Syensqo expands U.S. production capacity for advanced polymers 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction