Sheth, C.
Chetan Sheth is the Vice President and Unit Head-Engineering for Linde Engineering India. He has more than 25 yr of professional experience in petrochemicals, gas processing, refining, oil and gas, and fertilizer projects in leading multi-national EPC companies in the areas of plant layout and piping design, and project and engineering management. He manages engineering unit activities for local EPC projects and global work share projects with various Linde engineering entities around the world.
The new normal in petrochemical revamp projects
Environment & Safety
/ Petrochemicals
/ Project Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Management
/ People
You have made the decision to increase plant capacity—with a change in feed—in the existing facility.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction