Schmidt, G.
is the Group Lead of Process Design for cracking furnaces at Linde Engineering in Munich. Since joining Linde Engineering in 1985, he has been involved in process and mechanical design, as well as in the operational concerns of cracking furnaces. After gathering experience in development, sales, field work and project management, Schmidt took over responsibility for furnace design in 2006. He studied chemical engineering at the University of Erlangen–Nuremberg, where he graduated with a Dipl.-Ing. (M.Sc.).
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

