Heisel, M.
Minimize carbon footprint from Claus tail-gas units
Environment & Safety
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Carbon Management
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Gasoline
/ Greenhouse Gases
/ Heat Transfer
/ Loss Prevention
/ Middle East
/ Octane
/ Safety
/ Treating
Reevaluate emissions efficiencies on sulfur-removal operations
Debottleneck operations due to 'cleaner fuels' production
Oxygen enrichment is an option to reduce loadings for Claus plant
Consider onsite gas supply to meet processing needs
By outsourcing industrial gas sources, refiners can focus resources – capital and manpower – on upgrading crude oil into higher-value products
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction