Yu, F.
Allowable vapor control valve pressure drops
Understand the relationship between the pressure drop and the process system
Allowable liquid control valve pressure drops
Providing valve pressure drops at minimum, normal and maximum flows enables selecting the proper valve for the full operating range
A simple way to estimate equipment pressure drops
The equivalent line length method can be used to estimate equipment pressure drop at different operating conditions
A quick guide to compressor suction knockout drum sizing
Mist eliminator and gravity settling methods are reviewed
Generalized gravity flow line calculations
These equations handle fittings, instruments, block valves and different pipe sizes
Easy way to estimate realistic control valve pressure drops
Use this method to ensure proper operation and minimize operating costs
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction