Trivedi, U. B.
Usha B. Trivedi is an engineer with Hitech iSolutions LLP, which provides design support services across the globe. With years of experience in CAD drafting, conversion, 3D CAD modeling and 3D rendering, Ms. Trivedi provides insights for solutions for the process challenges faced by fabricators, designers, contractors, engineers and architects.
Engineering Practices—CAD for plant layout: Being right by being safe
When we think of oil and gas industry hazards, we often perceive them as an enormous oil rig engulfed in flames in the middle of nowhere.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Utilizing steam stripping to remove benzene from wastewater and waste streams: A guide to maintaining compliant benzene levels with confidence 4/15
- OQ, Royal Vopak partner to accelerate development of Duqm as an integrated industrial hub 4/15
- Samsung E&A awarded contract for polylactic acid plant in the UAE 4/15
- Kuwait commences merger of state oil firms KNPC and KIPIC 4/15
- Russia well prepared for refinery maintenances with high fuel stockpiles 4/15
- Japan's Fuji Oil restarts 143,000-bpd Sodegaura CDU after fire 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction