Florin Omota is a Senior Process Engineering Manager at Fluor in Amsterdam. He joined Fluor in 2005, where he is recognized as a subject matter expert in process control. In 2018, he became a Certified Functional Safety Expert by Exida. He also worked as Chief Engineer in an ether glycol and derivatives plant at Chimopar SA in Bucharest, Romania. In 1999, he joined the Chemical Engineering Department at the University of Amsterdam as a researcher in process simulation and reactive distillation. He holds a PhD in catalyst modification, slurry reactor performance improvement and scale-up.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium introduces world's first pharmaceutical bottle partially made with wood-based plastics 10/30
- Aramco, Petrovietnam sign Collaboration Framework Agreement for increased petrochemicals trade 10/30
- TotalEnergies studies Moroccan project to export green ammonia to Europe 10/30
- Changxing Island accelerates development of world-class green petrochemical industrial base 10/30
- U.S. gasoline stockpiles hit 2-yr low on stronger demand 10/30
- Dangote says refinery has 500 MM liters of petrol in storage, can meet Nigeria's demand 10/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction