Lenferink, J. E. O.
Jelle Ernst Oude Lenferink is a process engineering manager with 16 years of experience at Fluor in Amsterdam, The Netherlands, and has been leading several hydrocracker projects. He is also a specialist in distillation technology. He studied chemical engineering at the University of Groningen, The Netherlands, and completed a post-graduate degree in process design and development from the University of Twente, The Netherlands.
Design pressure reduction in high-pressure heat exchangers with dynamic simulation
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Heat Transfer
/ Loss Prevention
/ Safety
A commercial simulation tool is used to carry out the analysis of the transient phenomena caused by the tube rupture event during the design phase of an HP heat exchanger.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction