Lenferink, J. E. O.
Jelle Ernst Oude Lenferink is a process engineering manager with 16 years of experience at Fluor in Amsterdam, The Netherlands, and has been leading several hydrocracker projects. He is also a specialist in distillation technology. He studied chemical engineering at the University of Groningen, The Netherlands, and completed a post-graduate degree in process design and development from the University of Twente, The Netherlands.
Design pressure reduction in high-pressure heat exchangers with dynamic simulation
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Heat Transfer
/ Loss Prevention
/ Safety
A commercial simulation tool is used to carry out the analysis of the transient phenomena caused by the tube rupture event during the design phase of an HP heat exchanger.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

