Lenferink, J. E. O.
Jelle Ernst Oude Lenferink is a process engineering manager with 16 years of experience at Fluor in Amsterdam, The Netherlands, and has been leading several hydrocracker projects. He is also a specialist in distillation technology. He studied chemical engineering at the University of Groningen, The Netherlands, and completed a post-graduate degree in process design and development from the University of Twente, The Netherlands.
Design pressure reduction in high-pressure heat exchangers with dynamic simulation
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Heat Transfer
/ Loss Prevention
/ Safety
A commercial simulation tool is used to carry out the analysis of the transient phenomena caused by the tube rupture event during the design phase of an HP heat exchanger.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Parker Hannifin joins iHAPC project to test H2 and argon for cleaner and more energy-efficient engine technologies 2/27
- Thai SCG Chemicals unit seeks Vietnam tariffs as operations at new complex remain suspended 2/27
- Sipchem, LyondellBasell collaborate on feasibility for a world-scale mixed-feed cracker in Saudi Arabia 2/27
- Engineers find greener path to making key industrial chemical 2/27
- VDMA valves association market analysis: Industry standstill looms after a strong 2024 2/27
- Taiyo Oil selects Honeywell ETJ technology for SAF production 2/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction