Joyner, R.
Robert Joyner is a Principal Process Engineer at Fluor. He has more than 20 yr of experience in onshore and offshore oil and gas, refining and chemicals projects, specializing in overpressure protection and flare system design. He earned an MEng degree in chemical engineering from Imperial College London and is a chartered engineer with IChemE.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 2: CO2 as an energy storage medium
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 1: CO2 as a refrigerant
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Compressors
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Heat Transfer
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

