Srivastava, A.
Anand Srivastava is a Process Engineer for Fluor India. He has 16 yr of experience in executing FEED and detailed engineering activities across refining, petrochemical and specialty chemical projects. Srivastava earned his BS degree from the Indian Institute of Technology Kanpur.
Decarbonization opportunities in refinery and petrochemical complex-organic Rankine cycles
AI
/ Digital Technologies
/ Engineering & Design
/ Equipment
/ Information Systems
/ Management
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
In an organization’s pursuit of decarbonization, significant opportunities exist in recovering waste heat from high-temperature streams instead of rejecting it to heat sinks. This article analyzes the economics of using the organic Rankine cycle (ORC) to recover waste heat and generate electricity.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction