Singh, N.
Naresh K. Singh is a Process Engineer for Fluor India. He has more than 29 yr of experience in refining, petrochemical, chemical, gas processing and LNG regasification projects, executing feasibility studies, conceptual engineering, licensor evaluation, FEED and detailed engineering projects. Singh earned his BS degree from the Indian Institute of Technology Roorkee.
Decarbonization opportunities in refinery and petrochemical complex-organic Rankine cycles
AI
/ Digital Technologies
/ Engineering & Design
/ Equipment
/ Information Systems
/ Management
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
In an organization’s pursuit of decarbonization, significant opportunities exist in recovering waste heat from high-temperature streams instead of rejecting it to heat sinks. This article analyzes the economics of using the organic Rankine cycle (ORC) to recover waste heat and generate electricity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC deploys heavy-duty inspector robot for hazardous environments 5/21
- Indonesia to roll out ethanol-blended gasoline, B50 biodiesel from July 1 5/21
- Australia plans biofuel mandates to boost its energy security 5/21
- HyOrc commences fabrication for Porto waste-to-methanol plant and advances European project pipeline 5/21
- Chevron introduces next-gen Techron in U.S. Chevron and Texaco gasolines 5/21
- Kremlin sees no risk to fuel supply in Russia amid attacks on refineries 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

