Ceary, P. J.
Philip Ceary graduated from the University of Maryland College Park with a BS degree in chemical engineering in May 2002. He works in the field of process design, optimization and logistics, and project development for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design—Part 2
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Distillation
/ Drivers
/ Engineering & Design
/ Environment
/ Equipment
/ People
/ Products
/ Safety
/ Valves
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

