Toghraei, M.
Wide design margins do not improve engineering
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Piping
/ Pumps
/ Reactors
/ Turbines
/ Valves
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
Overflow systems are the last line of defense
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Loss Prevention
/ Piping
/ Safety
/ Treating
/ Valves
The overflow system is the last line of defense against the excessive container filling. An overflow system consists of an overflow nozzle with internal and/or external piping and, in some cases, a si..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction