Toghraei, M.
Wide design margins do not improve engineering
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Piping
/ Pumps
/ Reactors
/ Turbines
/ Valves
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
Overflow systems are the last line of defense
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Loss Prevention
/ Piping
/ Safety
/ Treating
/ Valves
The overflow system is the last line of defense against the excessive container filling. An overflow system consists of an overflow nozzle with internal and/or external piping and, in some cases, a si..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

