Patel, R.
R. Patel is the General Manager of the Fired Equipment Department for Engineers India Ltd. in New Delhi, India. He has 23 yr of experience in the design, execution and revamping of furnaces. Mr. Patel earned a degree in mechanical engineering from the Indian Institute of Technology–Roorkee, India.
What went wrong with my furnace?
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Natural Gas
/ Safety
/ Asia/Pacific
We should learn from our own mistakes and experiences, but it is wiser to keep track of and learn from all past mistakes and experiences, including those made by others.
Assess remaining life for heater tubes
Refineries and petrochemical plants form some of the major sections of the hydrocarbon industry and consume much of the fuel that is burned in furnaces (heaters and specialty furnaces, such as reformers and crackers) to meet process heating requirements.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction