Labhasetwar, S. G.
is a chemical engineer experienced in the design of oil, gas and petrochemical facilities. He holds a BS degree in chemical engineering from the Institute of Chemical Technology in Mumbai, India. He is a member of Engineers Australia and is a chartered professional engineer. He is also certified as an international professional engineer (Australia) and an APEC engineer, and he is a registered professional engineer of Queensland.
Protect tanks with pilot-operated vent valves
A number of devices are available for protecting low-pressure American Petroleum Institute (API) tanks against overpressurization. A case study demonstrates the need for the designer to analyze the en..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

