Labhasetwar, S. G.
is a chemical engineer experienced in the design of oil, gas and petrochemical facilities. He holds a BS degree in chemical engineering from the Institute of Chemical Technology in Mumbai, India. He is a member of Engineers Australia and is a chartered professional engineer. He is also certified as an international professional engineer (Australia) and an APEC engineer, and he is a registered professional engineer of Queensland.
Protect tanks with pilot-operated vent valves
A number of devices are available for protecting low-pressure American Petroleum Institute (API) tanks against overpressurization. A case study demonstrates the need for the designer to analyze the en..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ketjen announces pricing adjustment for hydroprocessing catalysts effective January 15, 2026 1/9
- Germany's Uniper nears agreement to buy green ammonia from India 1/9
- Digital Exclusive—Valve maintenance: An open and shut case? 1/9
- Serbia's Russian-owned NIS refiner buys first crude since U.S. sanctions waiver 1/9
- U.S. refiner Marathon Petroleum says it will be bidding for Venezuelan crude oil 1/9
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

