J. Griffin
Jim Griffin is a Director of research and development at Emerson. Dr. Griffin previously worked in reactor safety analysis with Commonwealth Edison before joining Emerson in 1995. He has more than 30 yr of experience in materials, acoustics, cavitation, flame detonation, additive manufacturing and pressure regulator design. Dr. Griffin earned his PhD in nuclear engineering from the University of Missouri – Columbia, and an MS degree in the same specialty from the Massachusetts Institute of Technology. He also holds a BS degree in nuclear engineering from the University of Buffalo, and an MBA degree from the University of Iowa.
Select the appropriate construction materials for valves and accessories
In refineries and petrochemical plants, valves and related components often come into contact with process media.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction