Wold, K.
Kjell Wold is the After Sales and Support Manager for Roxar Corrosion and Erosion Solutions/SME, at Emerson Automation Solutions. Mr. Wold has worked in corrosion monitoring for nearly 35 yr and has presented papers at numerous corrosion conferences. He earned an MS degree in electrochemistry from the Norwegian University of Science and Technology.
Mitigating corrosion challenges from opportunity crudes
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Process Optimization
/ Refining
/ Analyzers
/ Carbon Management
/ Construction
/ Corrosion
/ Crude oil
/ Desulfurization
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Management
/ Piping
/ Sulfur
/ Treating
High-quality crudes are not always readily available, or at a price that is acceptable to the producer’s budget.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction