Lemmers, S. P. B.
Sander P. B. Lemmers is Head of the Project Development Department in Dialog E&C Sdn Bhd. He has more than 26 yr of experience in both the technical and business facets of the global engineering, procurement and construction industry. Lemmers is involved in the development of small- and large-scale LNG and other liquefied gas and hydrocarbon terminals in Malaysia and Southeast Asia. He holds a BSc degree and an MSc degree in industrial engineering and management, and an MSc degree in chemical engineering, from Twente University for Technical and Social Sciences in Enschede, the Netherlands.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC deploys heavy-duty inspector robot for hazardous environments 5/21
- Indonesia to roll out ethanol-blended gasoline, B50 biodiesel from July 1 5/21
- Australia plans biofuel mandates to boost its energy security 5/21
- HyOrc commences fabrication for Porto waste-to-methanol plant and advances European project pipeline 5/21
- Chevron introduces next-gen Techron in U.S. Chevron and Texaco gasolines 5/21
- Kremlin sees no risk to fuel supply in Russia amid attacks on refineries 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

