Indgjer, M.
Mark Indgjer joined Det-Tronics in 2017 as an Applications Engineer for F&G safety systems. He has held a variety of roles in the fire industry for more than 25 yr. At present, he provides systems applications support and training for Det-Tronics. Mr. Indgjer holds a BS degree in marketing and is NICET Level II certified.
Integrating fire and gas safety with process control systems: Why, what and how
Environment & Safety
/ Gas Processing/LNG
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Americas
/ Asia/Pacific
/ Middle East
/ Petrochemicals
/ Loss Prevention
/ Refining
/ Safety
If a fire, smoke or gas leak is detected in a hydrocarbon processing facility, prescriptive actions must be taken by the fire and gas (F&G) safety system, as well as by the process control system (PCS), to mitigate and control the hazard.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Evonik presents innovative "Debonding on Demand" concept for more sustainable bonding 4/3
- Oil, gas and refined product imports exempted from Trump’s sweeping tariffs 4/3
- Reliance: India's gasoline demand to peak by 2035, diesel by 2041 4/3
- Mabanaft, HIF Global sign agreement to accelerate e-methanol adoption in the shipping industry 4/3
- Burckhardt Compression awarded digital monitoring services contract for a chemical plant in Saudi Arabia 4/3
- Lummus completes successful startup of electric heater demonstration unit 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction