Indgjer, M.
Mark Indgjer joined Det-Tronics in 2017 as an Applications Engineer for F&G safety systems. He has held a variety of roles in the fire industry for more than 25 yr. At present, he provides systems applications support and training for Det-Tronics. Mr. Indgjer holds a BS degree in marketing and is NICET Level II certified.
Integrating fire and gas safety with process control systems: Why, what and how
Environment & Safety
/ Gas Processing/LNG
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Americas
/ Asia/Pacific
/ Middle East
/ Petrochemicals
/ Loss Prevention
/ Refining
/ Safety
If a fire, smoke or gas leak is detected in a hydrocarbon processing facility, prescriptive actions must be taken by the fire and gas (F&G) safety system, as well as by the process control system (PCS), to mitigate and control the hazard.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
- U.S. okays transactions with Lukoil gas stations outside Russia through late April 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

