Poussin, G.
Guillaume Poussin is the Group Managing Director at CREALYST-Group. He has more than 15 yr of experience in the study and development of technologies concerning particle behavior during filling processes of cylindrical vessels for different applications (e.g., for catalysts and adsorbents and the agricultural storage of grain).
Solving maldistribution: Catalyst loading and why it matters
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Reactors
/ Americas
/ Europe
Are your reactor yields lower than forecast? Does your fixed-bed catalytic reactor suffer from hotspots?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Pemex is delivering only a fraction of feedstock to new Olmeca refinery 5/20
- Gulfstream LNG export terminal (U.S.) receives U.S. FERC approval 5/20
- China's April gasoline exports fall to lowest level since July 2015 on recovering domestic demand 5/20
- Mammoet successfully transports/installs record-breaking hydrocracker for ORLEN Lietuva refinery 5/20
- Johnson Matthey and thyssenkrupp Uhde join forces to offer an integrated solution for blue ammonia technology 5/20
- Russia's Tuapse oil refinery resumes operations after attack 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction