Lai, H.
Haiming Lai is a Principal Consultant with Integrated Oilsands and Bitumen Project of China National Offshore Oil Corp. (CNOOC) in Calgary, Canada. He has more than 20 yr of experience in modeling and simulation, process design and operation in the upgrading, refining and petrochemical industries. He holds a PhD in chemical engineering from Beijing University of Chemical Technology and is a registered professional engineer in Alberta, Canada.
Debottleneck H2 production for gasifier PSA-based plant
The Canadian oil sands reserves in the area surrounding Fort McMurray, Alberta in Canada contain in excess of 165 Bbbl of recoverable bitumen.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction