Foote, D.
Darin Foote is an Operations Superintendent at CHS Inc.’s Laurel refinery in Montana. While at CHS, he has held roles in refinery LP modeling, process engineering and turnaround management. Mr. Foote has been working 21 yr in the areas of crude/vacuum, FCCU, solvent extraction and fired heaters. Prior to joining CHS, he worked for Flint Hills Resources and John Zink Company in various roles. Mr. Foote earned a BS degree in chemical engineering from Brigham Young University in Provo, Utah.
Choosing an FCCU CO promoter is no longer driven by NOx emissions
Environment & Safety
/ Process Optimization
/ Refining
/ Carbon Management
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Americas
Fluidized catalytic cracking units (FCCUs) form coke during the reaction that combusts in the regenerator and supplies heat for the process.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction