Amutha, R.
R. Amutha is working as Assistant Manager in the Process Engineering department at CPCL’s Manali Refinery. She has more than 6 yr of experience in lube production facilities, including solvent extraction, solvent dewaxing and solvent deoiling units. She has handled several operational and energy improvement activities in the lube complex at CPCL.
Modified revamp process to reduce energy use in an SDA unit
Process Optimization
/ Project Management
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Natural Gas
Solvent deasphalting (SDA) is emerging as a low-cost, bottom-of-the-barrel upgrading process to recover valuable oil from short residue. This oil can either be further processed to make lube-oil-based stocks or cracked in secondary processing units.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction