Francis, J.
Improve performance monitoring of your turbomachinery
Gas Processing/LNG
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Drivers
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Rotating Equipment
This case study documents the performance variables to consider and apply when monitoring and tracking the efficiency deterioration for a steam turbine using DSs in a PI process book.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Phillips 66 sets the record straight on Gregory J. Goff’s relationship with Elliott Management 4/9
- Neste begins SAF production at its renewables refinery in Rotterdam, the Netherlands 4/9
- Clariant, Technip Energies to introduce new catalyst for low steam-to-oil ratios in styrene production 4/9
- U.S. exits carbon talks on shipping, urges others to follow 4/9
- Analysis: U.S. refiners unlikely to spend big to process more domestic oil 4/9
- China petchem plants face shutdown as tariffs on U.S. LPG loom 4/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction