O'Hearn, S.
Shawn O’Hearn is an Inspection Engineer supporting deepwater operations in the GoM for BP America. He has more than 10 yr of experience in inspection, integrity management and mechanical engineering in the upstream and midstream oil and gas industry.
Optimize your insulation to reduce costs
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Piping
/ Safety
/ Americas
Corrosion under insulation (CUI) is a common problem that is shared by the oil and gas (onshore and offshore), refining, petrochemical, power and manufacturing industries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Million Air and Avfuel bring SAF to Austin, Texas (U.S.) 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

