Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. oil, biofuel group recommends 5.25 Bgal in biomass diesel mandates 4/11
- Ukraine will add bioethanol to petrol from May, seeks first imports from EU 4/11
- UN shipping agency strikes deal on fuel emissions, CO2 fees 4/11
- S&P analysis: Global refined product demand growth likely to weaken, absolute decline cannot be ruled out 4/11
- U.S. targets China oil storage terminal in new Iran-related sanctions 4/11
- Russia's Novatek plans condensate processing complex in Murmansk 4/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction