Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Portugal's Galp plans to start producing biofuels in 2026 12/20
- Prax and Shell call off deal on stake in PCK Schwedt oil refinery 12/20
- Nigeria's Dangote Refinery hits 85% refining capacity 12/20
- India's BPCL buys first Argentinian crude oil cargo for Feb. delivery 12/20
- Sinopec's Zhenhai oil refinery expands capacity to 40 MMtpy 12/20
- Oil via Russia's Druzhba pipeline halted by technical problems 12/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction