Tiwari, V. K.
Vijay Kumar Tiwari is an Engineering Group Supervisor (Process Lead) at Bechtel India Pvt. Ltd. He has more than 18 yr of professional expertise in process design, development, engineering and management, and possesses extensive experience in managing petrochemical projects on a global scale. He earned his BTech degree in chemical engineering from the Indian Institute of Technology (IIT) in Delhi, India. His previous roles included positions at Toyo Engineering Korea and Engineers India Ltd.
Pellet handling system for polyolefin plants: Are you specifying it correctly?
Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Ethylene
/ Loss Prevention
/ Motors
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Storage
/ Valves
/ Olefins
Product pellets produced in polyolefin plants—such as polyethylene (PE) or polypropylene (PP)—require transportation from the unit to the end users that process these pellets to manufacture different end-use plastic products.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction