Varma, H.
Hardik Varma is a Senior Process Engineer with Bechtel Oil, Gas & Chemicals Inc. He has more than 9 yr of experience in areas that include delayed coking, petrochemicals, refining, LNG, coal gasification and fertilizers.
Enhanced flash zone design for coker fractionators
Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Africa
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
Since the flash zone is the first process undergone by the coke drum effluent vapor upon entering the column, the operation of the flash zone is critical to the operation of the entire coker fractionator column.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction