Varma, H.
Hardik Varma is a Senior Process Engineer with Bechtel Oil, Gas & Chemicals Inc. He has more than 9 yr of experience in areas that include delayed coking, petrochemicals, refining, LNG, coal gasification and fertilizers.
Enhanced flash zone design for coker fractionators
Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Africa
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
Since the flash zone is the first process undergone by the coke drum effluent vapor upon entering the column, the operation of the flash zone is critical to the operation of the entire coker fractionator column.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Million Air and Avfuel bring SAF to Austin, Texas (U.S.) 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

