At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction