Banerjee, P.
Implementing advanced process control on ammonia plants
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Safety
Benefits exceeding the guarantee were realized through APC by simultaneously stabilizing and optimizing the plant in the presence of significant feed density variations that impact the entire plant operation
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant, Technip Energies to introduce new catalyst for low steam-to-oil ratios in styrene production 4/9
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction